Home
Mud Jacking
Drilling
Grouting
Soil Modifications
Contact Us
Contact Us Today for a Free Estimate!
Pier-a-Mid, inc.

Mud Jacking

Mud Jacking is used to lift structures or roadways by drilling injection holes through the concrete slab or steel and hydraulically lifting the structure with a pressure injected cement or chemical grout. The chosen grout fills any voids and lifts the structure, roadway to level.

908 Tulane | Houston,TX 77008 | Tel: 713-869-7632 | Fax: 713-869-7648